Skip to content
Kent's PlumbingSaint Paul, MNAnswered 24/7(651) 215-2087
Fixtures, gas and remodels

Bathroom remodel plumbing in Saint Paul, MN

A bathroom remodel lives or dies on what's behind the walls and under the floor. We rough in drains, vents and supply lines so your new layout drains well, passes inspection, and doesn't leak into the ceiling below.

  • Phone answered 24/7
  • Saint Paul office on E 7th Street
Bathroom Remodel Plumbing in a Saint Paul home
Call before anything else

Tell us what you see and hear. We explain the visit and the likely cost on the phone. (651) 215-2087

The short answer

Bathroom remodel plumbing is the drain, vent and water line work that goes in before tile and fixtures. You need it when you move a toilet, shower or vanity, add a sink, or swap a tub for a walk-in shower. We plan the layout, pull the city permit, rough in the pipes, then set fixtures after tile. Typical Saint Paul ranges run $1,840 to $3,260 for a same-layout refresh and $4,370 to $8,960 when fixtures move.

What the plumber does before the tile goes up

Rough in is the stage between demolition and walls. We run new drain lines with proper slope, tie each fixture into a vent so traps don't siphon dry, and bring hot and cold supply lines to the exact heights your fixtures need. Shower valves go in now, set at the depth your tile thickness calls for, along with the stub for the showerhead and any body sprays or handheld bars.

Once rough in is done, the city inspector looks at the open work before it's covered. After that, your tile setter or general contractor closes the walls and finishes the floor. We come back at trim out to set the toilet, mount the faucets, connect the vanity drain, install the shower trim, and test everything under pressure and flow.

What bathroom remodel plumbing costs in Saint Paul

These are typical Saint Paul ranges for the plumbing portion of a bathroom remodel. We confirm the price after we've walked the space and seen the plan.

JobTypical range
Same layout refresh, new fixtures and valveToilet, vanity and shower stay put$1,840 to $3,260
Tub to walk-in shower conversionNew valve, drain and trap at the shower$2,370 to $4,185
Moving one or more fixtures on a framed floorNew drain and vent routing$4,370 to $7,240
Basement bathroom with slab workConcrete cutting and trenching included$5,690 to $8,960
Replacing galvanized supply lines in the roomWhile walls are open$687 to $1,435

What moves the price

  • How many fixtures move and how far
  • Floor type: framed joists or concrete slab
  • Condition of the existing stack, drains and supply lines
  • Fixture choices such as wall hung toilets or thermostatic valves
  • Permit and inspection requirements for the scope
  • Access from below through a finished or unfinished ceiling

Typical Saint Paul ranges. We confirm your price after we see the job and before work starts. See every price on one page.

How bathroom remodel plumbing goes, start to finish

  1. Walk the space and the plan

    We look at the existing drains, vent stack, joists and supply lines and go over the layout and fixture choices with you.

  2. Pull the permit

    We file for the city plumbing permit so the rough in and final inspections are scheduled correctly.

  3. Demo and cap

    Once fixtures come out, we cap drains and supplies, then remove any old galvanized or cast iron sections that need replacing.

  4. Rough in drains, vents and supplies

    We run new lines to the planned locations, set the shower valve depth, and pressure test before inspection.

  5. Pass rough in inspection

    The city inspector checks the open work, and once it passes, walls and floors can be closed.

  6. Trim out and test

    After tile, we set the toilet, faucets, drains and shower trim, then run every fixture and check for leaks.

Close view of bathroom remodel plumbing work

Moving a toilet, shower or sink: what's realistic

Moving supply lines is easy. Moving drains is where the real cost and planning live. A toilet needs a three inch drain, and how far it can move depends on joist direction, the location of the main stack, and whether there's a finished ceiling below. On a second floor bathroom, running a drain across the joists may mean notching limits come into play, or the drain may need to drop below the ceiling.

In basement bathrooms on a slab, moving a drain means cutting and trenching concrete. Showers and sinks often move more easily because their drains are smaller and the vent can run up through a nearby wall. We walk the space with you during the planning stage and tell you which moves are simple, which add cost, and which we'd steer you away from.

  • Vanity moves of a few feet along the same wall are usually simple
  • Toilet moves depend on joist direction and stack location
  • Tub to shower swaps often reuse the existing drain with a new trap
  • Curbless showers may need floor framing changes
  • Basement moves mean cutting into the slab

Why venting matters more than people think

Every drain in a bathroom needs air behind it. Without a vent, water rushing down the line pulls the water out of the trap, and sewer gas can drift into the room. Gurgling sinks, slow tubs and a toilet that bubbles when the shower drains are all classic signs of a venting problem. A remodel is the right moment to fix that while the walls are open.

Older homes often have bathrooms that were added or rearranged decades ago with minimal venting. We tie new fixtures into the existing vent stack where we can, and where that's not practical we use an air admittance valve if the city allows it in that location. The goal is quiet, fast drains that stay that way after the tile is set and grouted.

How we work with your contractor and tile setter

Most remodels involve several trades, and the plumbing has to land in the right place for all of them. We confirm fixture models before rough in, since a wall hung toilet, a vessel sink or a thermostatic shower valve each need their own measurements. Then we mark finished heights so the tile setter knows where the valve trim, showerhead and niche will sit.

We set shower drains to match the pan or linear drain system your tile setter is using, and we pressure test supply lines before walls close. If a schedule slips or a fixture changes midway, give us a ring and we'll adjust. Clear communication at each stage keeps the inspector happy and keeps your project from stalling between trades.

Signs it is time for bathroom remodel plumbing

You want to move a fixture

Shifting a toilet a couple of feet or turning a tub alcove into a shower changes drain and vent routing, and that needs a plan before demolition.

The old pipes are galvanized or cast iron

Walls opened for a remodel are the cheapest time to replace narrowed galvanized supply lines or a rusting cast iron drain section.

Drains in the bathroom are slow

A tub and sink that already drain slowly often share a clogged or poorly vented branch that new tile would bury.

Signs of past leaks under the floor

Soft subfloor around the toilet or stains on the ceiling below mean the floor needs opening and the drain connections need checking.

Adding a curbless or walk-in shower

A low profile shower pan needs the drain set at the right height and pitch, which often means cutting into joists or the slab carefully.

A second sink or a freestanding tub

Double vanities and floor mounted tub fillers need new supply runs and drain branches that the original bathroom never had.

Remodeling bathrooms in Saint Paul's older houses

A large share of Saint Paul houses were built before World War II, and their bathrooms show it. In Highland Park, Macalester-Groveland and around Summit-University, we regularly open walls to find galvanized supply lines, a cast iron stack with lead and oakum joints, and floors set in thick mortar beds. These aren't reasons to panic, but they're reasons to budget for some replacement while everything is exposed.

Many of these homes also have a single bathroom upstairs, so we plan the work to keep the outage short. That might mean setting a temporary toilet, roughing in on a tight schedule, or making sure the kitchen sink and basement laundry stay usable. In newer suburbs like Woodbury, the challenge is usually hard water scale and plastic drain lines, which are easier to reroute but need careful support.

Where we do bathroom remodel plumbing

Saint Paul and the surrounding east metro. These are the busiest ZIP codes on our board; the full list has 55 neighborhoods, cities and counties.

Questions about bathroom remodel plumbing

Does a bathroom remodel in Saint Paul need a plumbing permit?

Yes, moving or adding drains, vents or supply lines, and replacing a shower valve inside the wall, generally needs a city plumbing permit and inspections. We pull the permit as part of the job and schedule the rough in and final inspections so the work is documented when you sell the house later.

How long does the plumbing part of a bathroom remodel take?

For a same layout refresh, rough in usually takes one to two days and trim out about a day. When fixtures move or slab work is involved, rough in can run three to five days. The wait between rough in and trim out depends on inspection timing and how long tile work takes.

Should I replace old pipes during my bathroom remodel?

If the walls are open and the supply lines are galvanized or the drain is old cast iron, it's usually worth replacing the sections in that room. The labor to reach them is already done, and new tile won't have to come off later for a leak. We'll show you what we find and you decide.

Can I buy my own fixtures for the bathroom remodel plumbing?

Yes. Many homeowners pick their own faucets, toilets and valves. We just need the exact models before rough in so we set the right heights and depths. Shower valves especially must match the trim you bought. If a fixture is missing parts or doesn't fit, we'll let you know before it causes a delay.

Brands we work on in Saint Paul homes

  • Kohler
  • Moen
  • Delta
  • American Standard
  • Rheem
  • A. O. Smith
  • Bradford White
  • Navien
  • Rinnai
  • InSinkErator
  • Zoeller
  • Liberty Pumps
  • Watts
  • Weil-McLain

Call the Saint Paul office, day or night

A real person picks up at any hour. Tell us what you are seeing, and we will tell you what happens next and roughly what it costs.

(651) 215-2087
Phone
Answered 24 hours a day, 7 days a week
Office
289 E 7th Street, Saint Paul, MN 55101
Headquarters
50666 229th Ave, Bemidji, MN 56601
Coverage
Saint Paul and the east metro, see all areas
Call (651) 215-2087